{"id":4824,"date":"2021-06-28T20:10:43","date_gmt":"2021-06-28T20:10:43","guid":{"rendered":"https:\/\/arito.com.pt\/projectos\/restabelecimento-da-en102-e-em325-e-nova-ponte-sobre-o-rio-sabor\/"},"modified":"2021-11-02T13:11:01","modified_gmt":"2021-11-02T13:11:01","slug":"en102-and-em325-roads-redesign-and-new-bridge-across-the-sabor-river","status":"publish","type":"projectos","link":"https:\/\/www.arito.com.pt\/en\/projectos\/en102-and-em325-roads-redesign-and-new-bridge-across-the-sabor-river\/","title":{"rendered":"EN102 and EM325 roads redesign and new Bridge across the Sabor River"},"content":{"rendered":"<p>The downstream dam of the Baixo Sabor Hydroelectric Development has flooded the EN102 \/ EM325 roads near the Sabor River, including the existing Portela Bridge. This required the redesign of 3.6km of these roads and a new link between the two banks of the Sabor River.<\/p>\n<p>The superstructure, 268m long between abutment bearings, consists of a single-cell box with a variable depth cross-section with two top flange cantilevers. It has a main span of 120m and two side spans of 74m. Both piers, the highest one reaching about 40m, are of a similar configuration with box shaped lower shafts each one headed by upper twin prestressed rectangular shafts fixed in the deck cross-section.<br \/>\nThe foundations are direct in schistic formations.<\/p>\n<p>The water level of the new Sabor Dam will attain the piers&#8217; upper shafts thus resulting in an elegant and unusual landscape integration of the bridge.<\/p>\n<p>The tasks carried out encompassed the EN102 and EM325 road studies and the preliminary and detailed design of the new road and Bridge, including all the disciplines, such as drainage, paving, fencing, affected services, lighting, traffic signing, security and landscape integration.<\/p>\n","protected":false},"featured_media":0,"template":"","categories":[],"tags":[],"class_list":["post-4824","projectos","type-projectos","status-publish","hentry"],"acf":{"enquadramento":"r1","imagem_hp_destaque_c\u00f3pia":false,"ganhou_premio":false,"mapa":{"address":"IP2, 5160, Portugal","lat":41.209870289184884,"lng":-7.083309896992265,"zoom":15,"place_id":"ChIJSXcylKSCOw0RtLjsoux5VCY","street_name":"IP2","state":"Bragan\u00e7a","post_code":"5160","country":"Portugal","country_short":"PT"},"mapa_pin":"<p>EN102 and EM325 roads redesign and new Bridge across the Sabor River<\/p>\n<p>Baixo Sabor Hydroelectric Dam | Portugal<\/p>\n","imagem_hp_destaque":{"ID":4154,"id":4154,"title":"P352_Projeto_568x320","filename":"P352_Projeto_568x320.jpg","filesize":54839,"url":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_568x320.jpg","link":"https:\/\/www.arito.com.pt\/en\/projectos\/restabelecimento-da-en102-e-em325-e-nova-ponte-sobre-o-rio-sabor\/p352_projeto_568x320\/","alt":"","author":"12","description":"","caption":"","name":"p352_projeto_568x320","status":"inherit","uploaded_to":4153,"date":"2021-06-28 20:08:49","modified":"2021-06-28 20:08:49","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.arito.com.pt\/wp-includes\/images\/media\/default.png","width":568,"height":320,"sizes":{"thumbnail":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_568x320-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_568x320-300x169.jpg","medium-width":300,"medium-height":169,"medium_large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_568x320.jpg","medium_large-width":568,"medium_large-height":320,"large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_568x320.jpg","large-width":568,"large-height":320,"1536x1536":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_568x320.jpg","1536x1536-width":568,"1536x1536-height":320,"2048x2048":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_568x320.jpg","2048x2048-width":568,"2048x2048-height":320}},"localizacao":"Baixo Sabor Hydroelectric Dam | Portugal | 2013\r\n","imagem_hp_destaque_c\u00f3pia2":{"ID":4156,"id":4156,"title":"P352_Projeto_Interna","filename":"P352_Projeto_Interna.jpg","filesize":130228,"url":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_Interna.jpg","link":"https:\/\/www.arito.com.pt\/en\/projectos\/restabelecimento-da-en102-e-em325-e-nova-ponte-sobre-o-rio-sabor\/p352_projeto_interna\/","alt":"","author":"12","description":"","caption":"","name":"p352_projeto_interna","status":"inherit","uploaded_to":4153,"date":"2021-06-28 20:09:01","modified":"2021-06-28 20:09:01","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.arito.com.pt\/wp-includes\/images\/media\/default.png","width":900,"height":960,"sizes":{"thumbnail":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_Interna-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_Interna-281x300.jpg","medium-width":281,"medium-height":300,"medium_large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_Interna-768x819.jpg","medium_large-width":768,"medium_large-height":819,"large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_Interna.jpg","large-width":800,"large-height":853,"1536x1536":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_Interna.jpg","1536x1536-width":900,"1536x1536-height":960,"2048x2048":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Projeto_Interna.jpg","2048x2048-width":900,"2048x2048-height":960}},"galeria_de_fotografias":[{"ID":4159,"id":4159,"title":"P352_Galeria_1","filename":"P352_Galeria_1.jpg","filesize":245661,"url":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_1.jpg","link":"https:\/\/www.arito.com.pt\/en\/projectos\/en102-and-em325-roads-redesign-and-new-bridge-across-the-sabor-river\/p352_galeria_1-2\/","alt":"","author":"12","description":"","caption":"","name":"p352_galeria_1-2","status":"inherit","uploaded_to":4824,"date":"2021-06-28 20:09:56","modified":"2021-06-28 20:09:56","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.arito.com.pt\/wp-includes\/images\/media\/default.png","width":1000,"height":1400,"sizes":{"thumbnail":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_1-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_1-214x300.jpg","medium-width":214,"medium-height":300,"medium_large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_1-768x1075.jpg","medium_large-width":768,"medium_large-height":1075,"large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_1-731x1024.jpg","large-width":731,"large-height":1024,"1536x1536":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_1.jpg","1536x1536-width":1000,"1536x1536-height":1400,"2048x2048":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_1.jpg","2048x2048-width":1000,"2048x2048-height":1400}},{"ID":4161,"id":4161,"title":"P352_Galeria_2","filename":"P352_Galeria_2.jpg","filesize":166161,"url":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_2.jpg","link":"https:\/\/www.arito.com.pt\/en\/projectos\/en102-and-em325-roads-redesign-and-new-bridge-across-the-sabor-river\/p352_galeria_2-2\/","alt":"","author":"12","description":"","caption":"","name":"p352_galeria_2-2","status":"inherit","uploaded_to":4824,"date":"2021-06-28 20:10:00","modified":"2021-06-28 20:10:00","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.arito.com.pt\/wp-includes\/images\/media\/default.png","width":1000,"height":614,"sizes":{"thumbnail":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_2-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_2-300x184.jpg","medium-width":300,"medium-height":184,"medium_large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_2-768x472.jpg","medium_large-width":768,"medium_large-height":472,"large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_2.jpg","large-width":800,"large-height":491,"1536x1536":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_2.jpg","1536x1536-width":1000,"1536x1536-height":614,"2048x2048":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_2.jpg","2048x2048-width":1000,"2048x2048-height":614}},{"ID":4163,"id":4163,"title":"P352_Galeria_3","filename":"P352_Galeria_3.jpg","filesize":142072,"url":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_3.jpg","link":"https:\/\/www.arito.com.pt\/en\/projectos\/en102-and-em325-roads-redesign-and-new-bridge-across-the-sabor-river\/p352_galeria_3-2\/","alt":"","author":"12","description":"","caption":"","name":"p352_galeria_3-2","status":"inherit","uploaded_to":4824,"date":"2021-06-28 20:10:03","modified":"2021-06-28 20:10:03","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.arito.com.pt\/wp-includes\/images\/media\/default.png","width":1000,"height":614,"sizes":{"thumbnail":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_3-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_3-300x184.jpg","medium-width":300,"medium-height":184,"medium_large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_3-768x472.jpg","medium_large-width":768,"medium_large-height":472,"large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_3.jpg","large-width":800,"large-height":491,"1536x1536":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_3.jpg","1536x1536-width":1000,"1536x1536-height":614,"2048x2048":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_3.jpg","2048x2048-width":1000,"2048x2048-height":614}},{"ID":4165,"id":4165,"title":"P352_Galeria_4","filename":"P352_Galeria_4.jpg","filesize":101976,"url":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_4.jpg","link":"https:\/\/www.arito.com.pt\/en\/projectos\/en102-and-em325-roads-redesign-and-new-bridge-across-the-sabor-river\/p352_galeria_4-2\/","alt":"","author":"12","description":"","caption":"","name":"p352_galeria_4-2","status":"inherit","uploaded_to":4824,"date":"2021-06-28 20:10:05","modified":"2021-06-28 20:10:05","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.arito.com.pt\/wp-includes\/images\/media\/default.png","width":1000,"height":614,"sizes":{"thumbnail":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_4-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_4-300x184.jpg","medium-width":300,"medium-height":184,"medium_large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_4-768x472.jpg","medium_large-width":768,"medium_large-height":472,"large":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_4.jpg","large-width":800,"large-height":491,"1536x1536":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_4.jpg","1536x1536-width":1000,"1536x1536-height":614,"2048x2048":"https:\/\/www.arito.com.pt\/wp-content\/uploads\/2021\/06\/P352_Galeria_4.jpg","2048x2048-width":1000,"2048x2048-height":614}}]},"_links":{"self":[{"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/projectos\/4824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/projectos"}],"about":[{"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/types\/projectos"}],"version-history":[{"count":2,"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/projectos\/4824\/revisions"}],"predecessor-version":[{"id":5177,"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/projectos\/4824\/revisions\/5177"}],"wp:attachment":[{"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/media?parent=4824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/categories?post=4824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arito.com.pt\/en\/wp-json\/wp\/v2\/tags?post=4824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}